Request a Quote

Power distribution equipment

New Switchgear Retrofit Sections

Order a newly manufactured retrofit section designed around a compatible existing lineup. Confirm enclosure dimensions, bus-stab geometry, interlocks, controls and system conditions before engineering the integration.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Switchgear cabinets with breakers on warehouse pallets
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Define the Retrofit Boundary

A new retrofit section can add capacity or replace a defined portion of an existing switchgear lineup, but compatibility must be established before fabrication. Start by identifying the intended lineup, the section being added or replaced, adjacent equipment, and whether the work involves a new feeder, protection scheme, or control function.

Clarify what remains in service and what will be modified, removed, or isolated during installation. Existing gear may have accumulated field changes that differ from original drawings. Provide current photographs, nameplate information, one-line diagrams, and available shop drawings so the design team can distinguish verified conditions from assumptions.

Measure the Existing Lineup

Record the available width, depth, height, mounting surfaces, floor elevations, and clearances around the proposed section. Include door swing, cable access, overhead obstructions, and the working space needed for installation and future maintenance. Dimensions should reference consistent datums and identify any irregularities in the lineup or room.

A section that fits an opening may still conflict with bus supports, wiring ducts, barriers, or nearby equipment. Confirm access routes and handling constraints as well as final placement. If field dimensions are uncertain, arrange a controlled site survey with appropriate safety procedures rather than relying on nominal catalog dimensions.

Verify Bus Stab Compatibility

Bus-stab design depends on the existing bus arrangement, not merely the lineup name. Document phase sequence, bus orientation, elevations, spacing, conductor dimensions, connection surfaces, and the location of supports and barriers. Confirm whether the interface is accessible and whether connection hardware or an adapter arrangement is required.

The responsible engineer should evaluate electrical ratings and short-circuit withstand requirements across the connected assembly, using verified equipment data and applicable design criteria. Do not assume that matching physical dimensions establishes electrical compatibility. Connection material, plating, contact pressure, insulation, clearances, and installation access may all affect the proposed interface.

Coordinate Ratings and Protection

Provide system voltage, frequency, available fault-current information, source configuration, grounding method, and the intended continuous load. Identify the protective devices and coordination requirements associated with the new section. Ratings and construction must be evaluated for the complete application and cannot be inferred from a neighboring compartment alone.

The equipment category and applicable standards depend on the design. UL 891 applies to switchboards; UL 1558 applies to low-voltage switchgear. Medium-voltage equipment is a distinct category with different requirements. Identify the existing lineup accurately, then have the responsible engineer confirm the appropriate equipment basis and applicable approvals.

Match Interlocks and Operating Sequence

List every mechanical or electrical interlock that affects the section and adjacent devices. Examples may include door-to-device relationships, transfer schemes, key interlocks, or source permissives, depending on the existing design. Obtain device identification, operating sequence, and control diagrams rather than specifying an interlock only by name.

Review how operators will isolate, test, connect, or transfer equipment under the intended procedure. An added section must not create an ambiguous sequence or conflict with existing interlocks. The responsible engineer and facility operations team should validate the proposed logic and confirm any required field interfaces before release for manufacture.

Specify Controls and Wiring Interfaces

Describe the control functions the new section must perform, including trip and close circuits, status indications, metering, alarms, and communications where applicable. Identify control voltage, terminal conventions, wire-entry direction, spare-point expectations, and interfaces to existing relays, PLCs, or supervisory systems.

Existing control wiring can be difficult to trace, especially after undocumented changes. Provide current schematics, terminal plans, device settings where relevant, and point lists. Confirm who will furnish field wiring, termination, programming, and commissioning tasks; these responsibilities should be explicit in the project scope rather than assumed.

Plan Installation and Transition

An integration plan should address outage windows, equipment isolation, removal sequence, temporary protection, cable reconnection, and access for lifting or rigging. Confirm whether the new section can be installed as a complete assembly or must be handled in subassemblies, based on route dimensions and site conditions.

Coordinate shutdown and energization steps with the facility, contractor, utility when applicable, and authority having jurisdiction. Confirm inspection, testing, and commissioning responsibilities before work begins. The installation plan should account for the existing lineup’s condition and avoid treating a design drawing as confirmation of field fit or safe work procedures.

Prepare a Complete Quote Package

For a useful quote, submit the existing lineup manufacturer and model if known, nameplate photographs, overall and interface dimensions, one-line diagram, bus details, control schematics, device schedule, and project ratings. Include the intended function, quantity, delivery destination, schedule needs, and any site or documentation requirements.

The manufacturer builds new equipment in the United States using American components and can provide custom fabrication, short lead times, and nationwide shipping. Final scope and schedule depend on engineering review, component availability, and confirmed interfaces. Have the responsible engineer, utility, and AHJ review applicable design details before procurement and installation.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields