Request a Quote

Power distribution equipment

Main-Tie-Main Switchgear

Plan new main-tie-main equipment around source availability, bus loading, and a defined transfer sequence. Our U.S. team builds custom power distribution equipment for projects in Ohio and nationwide.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Electrical equipment sections on a flatbed trailer outdoors
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

How the Main-Tie-Main Arrangement Works

A main-tie-main lineup has two incoming main devices, each supplying a bus section, and a tie device connecting those sections. The arrangement can let one source serve both sections when the other source is unavailable, subject to the equipment design, source capacity, protection scheme, and approved operating procedure.

The topology alone does not define how transfer occurs. A project may use manual operation, electrical controls, automatic transfer logic, or a combination. Confirm whether sources are utility services, transformers, generators, or another combination, and identify which operating states must be permitted or blocked.

Choose the Transfer Philosophy Before the Layout

The key decision is whether the system uses open transition, where the outgoing source is disconnected before the alternate source is connected, or permits a closed transition with a brief parallel condition. Closed transition requires careful review of utility rules, source synchronization, protection, and control design; it should never be assumed from a three-device arrangement.

Document normal and abnormal sequences in plain language: which main is normally closed, whether the tie is normally open, what initiates a transfer, and how restoration occurs. Include manual switching steps, any automatic logic, and required operator permissions so the lineup and controls support the intended procedure.

Interlocks Must Match the Operating Sequence

Mechanical and electrical interlocks can prevent specified device combinations, such as closing the tie while both mains are closed. The required interlock scheme depends on source relationships and whether paralleling is allowed. Identify the prohibited states, permitted transitions, and behavior during loss of control power or a device-position disagreement.

Interlocks are not a substitute for a complete protection and operating review. Confirm whether key interlocks, hardwired permissives, control logic, or other methods are appropriate, and how bypasses, test modes, and maintenance conditions are handled. The responsible engineer should review the sequence and protection coordination before equipment release.

Size Each Bus for Realistic Contingencies

Specify the continuous current required for each incoming main, tie, and bus section, including the condition in which one source carries loads from both sections. Check load profiles, demand, future expansion, and any load-shedding plan. A source that can close the tie may still lack capacity to support every connected load.

Short-circuit duty and withstand requirements depend on available fault current, source impedance, transformer data, and system configuration. Ask the utility or source provider for applicable information, and have the engineer evaluate credible operating states. Ratings and construction details must be selected for the actual project, not inferred from the lineup name.

Distinguish Switchboard and Switchgear Requirements

For low-voltage distribution, the specification must identify whether the application calls for a UL 891 switchboard or UL 1558 low-voltage switchgear. These are distinct equipment categories; the project’s construction, service conditions, and specifications determine the appropriate choice. Neither designation describes medium-voltage equipment.

If the incoming service or distribution is medium voltage, specify equipment for that voltage class and applicable project requirements separately. Do not treat a low-voltage main-tie-main description as a complete medium-voltage specification. Confirm system voltage, grounding, utility interface, protection, and required construction with the design team and authority having jurisdiction.

Protection, Controls, and Indication

A coordinated design addresses overcurrent protection on mains and tie, fault contribution from each source, and selectivity for the intended operating modes. Provide available relay or trip-unit requirements, metering points, alarm contacts, communications needs, and any load-shed signals. Control and instrument details should follow the project one-line and sequence narrative.

Indication should help operators distinguish source availability, device position, and transfer permissives without ambiguity. Specify control voltage, local and remote commands, status points, and interfaces to building or plant systems where required. Confirm fail-safe behavior and control-power arrangements with the engineer; exact features depend on the approved design.

Plan Physical Integration and Service Access

The lineup must fit the electrical room and the installation route, not just the one-line diagram. Provide available width, height, depth, aisle and working-space constraints, cable entry direction, conductor sizes, termination preferences, and floor or housekeeping-pad details. Identify environmental conditions and any seismic or other site-specific requirements for review.

Coordinate outgoing feeder counts, breaker or fusible-device needs, spare space, and future additions before fabrication. Check conduit locations, overhead bus or cable routing, ventilation, and access for inspection and maintenance. These details shape custom fabrication and may affect arrangement, shipping sections, and field connections.

What to Provide for a Project Quote

A useful quote package includes the one-line diagram, system voltage and frequency, source and transformer data, available fault current, load schedule, requested ratings, and applicable specifications. Add the transfer sequence, interlock requirements, protection preferences, control schematics if available, and any utility or owner standards that govern the installation.

Our team manufactures new switchgear and power distribution equipment in the United States using American components, with custom fabrication, short lead times, and nationwide shipping. Provide delivery location, project milestones, drawing-review needs, and known site restrictions. Final configuration, applicable standards, and ratings remain subject to engineering review and project approval.

Review the Design Before Equipment Release

Before approval, compare the proposed lineup and control sequence against the one-line, load assumptions, protection study, and operating procedures. Verify that normal, emergency, maintenance, and restoration states are covered, including whether the tie is expected to carry both sections and what limits apply during that condition.

The responsible electrical engineer should confirm design suitability, and the utility and AHJ should be consulted where their requirements apply. Resolve open items before release, including source paralleling permission, coordination settings, labeling, and field interface responsibilities. Clear documentation helps the contractor install and commission the specified new equipment as intended.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields