Power distribution equipment

Distribution Switchboards

Plan a new distribution switchboard around its source, outgoing feeder schedule, protective devices, metering needs, and available space. We build custom equipment in the U.S. with American components and ship nationwide.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Enclosed electrical switchboard with meters and breakers
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Start With the Switchboard’s Role

A distribution switchboard divides power from an upstream service or distribution point among downstream loads, panels, or equipment. Its arrangement should reflect the actual electrical system: source characteristics, nominal voltage, phase and wire configuration, available fault current, and the location of each outgoing feeder. These inputs shape the lineup and the protection options.

Confirm whether the board is service equipment or downstream distribution, and identify the upstream protective device and grounding arrangement. Service-entrance requirements differ from those for a downstream board. The responsible engineer should verify the one-line diagram, applicable codes, utility requirements, and AHJ expectations before a configuration is finalized.

Organize Feeders Around the Load

A feeder schedule is the practical starting point for laying out sections and protective devices. For every outgoing circuit, provide the destination, conductor information, load type, design current, and any known starting or inrush behavior. Grouping related loads can improve circuit identification and maintenance access, but the electrical design determines the required ratings.

The number and size of feeders affect bus arrangement, section width, termination space, and cable routing. Identify top or bottom entry, conduit locations, and whether conductors land from the front or rear. These are project-specific decisions, not assumed features; drawings and site constraints should be reviewed before fabrication.

Select Protection for Each Circuit

Outgoing circuits may use molded-case circuit breakers, fusible switches, or other arrangements appropriate to the design and application. Selection depends on circuit voltage, continuous load, conductor ampacity, fault duty, coordination objectives, and the characteristics of connected equipment. Do not choose devices solely from a nominal load value or a desired frame size.

Ask the engineer to establish interrupting ratings and protective-device settings using the system study and applicable requirements. Selective coordination, ground-fault protection, and adjustable trip functions may be needed in some systems, but are not universal. The quote package should identify the requested device type, poles, rating, accessories, and any study-dependent requirements.

Check Fault Duty and System Coordination

Available short-circuit current at the switchboard is a key design input. It is influenced by the source, transformer characteristics, conductor impedance, and upstream system configuration. The equipment’s applicable short-circuit rating and protective devices must suit the evaluated conditions; a rating should not be inferred from appearance or from another project.

Provide current one-line diagrams, transformer data, upstream device information, and any completed short-circuit or coordination studies. If these are not available, flag the gap for the responsible engineer to resolve. Review changes in source capacity or utility contribution because they can affect device selection and equipment suitability.

Plan Metering and Useful Indications

Metering can support energy monitoring, operating decisions, and troubleshooting, but the required points should be defined first. Decide whether measurements are needed at the incoming section, selected feeders, or both, and specify the desired values, such as current, voltage, power, or energy. Confirm whether communications or integration with a facility monitoring system are required.

Meter form, instrument transformers, display location, control power, and communications interfaces depend on the application and selected devices. Identify accuracy or reporting requirements where applicable and provide the intended network protocol or connection details. Confirm with the engineer and controls team that the proposed metering arrangement fits the system and operating plan.

Make Room for Practical Expansion

Future capacity planning is more useful when it identifies likely additions rather than relying on a general request for spare space. Estimate prospective feeder sizes, load types, and installation timing, then determine whether the design should reserve physical section space, bus capacity, or both. These provisions are not interchangeable and require engineering review.

A physically open space does not automatically mean a future circuit can be added without changes to the board or system. Bus ratings, fault duty, device compatibility, clearances, and available room all matter. Tell the manufacturer which expansion provisions are desired so the proposed construction can be evaluated against the planned operating conditions.

Resolve Installation and Access Constraints

Room dimensions and access routes can govern section dimensions, shipping splits, and installation sequence. Provide the available footprint, ceiling height, door and aisle clearances, floor conditions, and any restrictions on moving equipment into the electrical room. Identify environmental conditions and whether the installation location has special enclosure or space requirements.

Cable entry and termination access deserve early attention, especially where large conductors, parallel runs, or limited bending space are involved. Share conduit stub-up locations, overhead routing, and preferred working access. The installer and engineer should verify code-required working space, egress, ventilation, and maintainability for the final location.

Prepare a Complete Quote Package

A useful request for quotation includes the one-line diagram, feeder schedule, system voltage and frequency, source and fault-current data, specified standards, and desired switchboard arrangement. Add device requirements, metering points, enclosure details, cable-entry preferences, and any anticipated expansion. Mark unresolved items clearly rather than treating assumptions as approved design inputs.

We manufacture new custom distribution switchboards in the U.S. using American components, with fabrication and shipment available for Ohio projects and customers nationwide. Lead time depends on the approved design, component availability, and project scope. Before release, the responsible engineer, utility where applicable, and AHJ should review requirements and confirm the completed design.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.