Request a Quote

Manufacturing capabilities

Protective Device Coordination Planning

Coordinate new power distribution equipment around the actual protection objectives, device characteristics, and system data—not assumptions. Identify the curves, settings, and configuration details engineers need to evaluate selectivity and prepare a meaningful equipment quote.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Switchgear cabinets in an electrical equipment room
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Define What Coordination Must Accomplish

A coordination study compares protective-device time-current characteristics to determine how devices are expected to respond across specified fault and overload conditions. Begin by stating the operating objective: for example, whether a downstream branch device should clear a fault before an upstream feeder or main device operates. The responsible engineer defines the intended boundaries and exceptions.

Perfect selectivity is not always feasible across every current level, operating mode, or device pairing. Document where continuity is important, which loads may be interrupted, and whether coordination is required only for designated circuits. These priorities shape equipment configuration and study assumptions; they are not guaranteed merely by selecting a particular switchboard or breaker.

Map the Distribution System

A useful review starts with a one-line diagram showing the source, transformers, buses, mains, feeders, ties, and significant downstream protective devices. Identify voltage, phase, grounding arrangement, transformer impedance and connection, and conductor information where available. Note normal and alternate feeds, generator sources, and tie-breaker positions because each can change available fault current and coordination.

For a new equipment quote, identify the proposed lineup arrangement, service entrance requirements, bus sections, incoming and outgoing devices, and anticipated future circuits. Mark which existing downstream devices must coordinate with the new assembly. Missing or preliminary data should be labeled as such, so engineers can separate confirmed design inputs from assumptions requiring later verification.

Gather Curves and Device Data

Time-current curves show how a protective device responds over a range of current; the relevant curve depends on device type, rating, trip unit, and selected settings. Collect manufacturer and model information for existing breakers, fuses, relays, and motor protection. Include curve files or published characteristic data when available, along with sensor, rating-plug, and trip-unit details.

For proposed equipment, specify the intended device family and functional requirements rather than assuming a curve from a generic frame size. Adjustable electronic trip units may offer long-time, short-time, instantaneous, or ground-fault functions, but availability and setting ranges depend on the selected device. Confirm the actual catalog data and options before the study relies on them.

Specify Settings and Protection Functions

Record existing settings as found, including pickup values, delays, instantaneous thresholds, and ground-fault parameters where applicable. Distinguish field settings from factory defaults or design targets. For proposed devices, provide the engineer's preferred setting ranges or protection functions, while recognizing that final values require analysis of system conditions, equipment limits, and the coordination objective.

Some applications use short-time delay or reduced instantaneous protection to improve selectivity, but these choices can affect clearing time and equipment exposure. Ground-fault protection has separate sensing and coordination considerations. Do not prescribe settings solely to make curves appear separated; the responsible engineer must evaluate conductor protection, arc-flash implications, device capabilities, and applicable codes.

Account for Sources and Operating Modes

Available fault current varies with utility conditions, transformer characteristics, generators, and other connected sources. Request utility fault-current data at the service point and transformer nameplate or impedance information. For generator-fed or other alternate operation, provide source ratings, reactance data when available, and the switching arrangements that determine which sources operate together.

A system may have distinct normal, emergency, maintenance, or parallel-source configurations. Identify the breakers and ties open or closed in each mode, and indicate any transfer scheme or operating restrictions. A single set of curves may not demonstrate coordination in every mode. Engineers should assess relevant configurations and confirm assumptions with the utility and authority having jurisdiction where required.

Check Device Pairing and Equipment Limits

Coordination decisions must account for device-specific behavior, not just curve appearance. Fuses, molded-case breakers, insulated-case breakers, low-voltage power circuit breakers, and relays use different characteristics and data conventions. Confirm device interrupting ratings and assembly short-circuit ratings against the calculated conditions; coordination does not establish that equipment can safely withstand or interrupt available fault current.

Equipment type also matters. UL 891 switchboards and UL 1558 low-voltage switchgear are distinct product categories, with different construction and application considerations; neither designation substitutes for a coordination study. Medium-voltage equipment requires appropriately rated devices and engineering analysis. Specify system voltage and intended equipment class early, and have the responsible engineer verify suitability.

Prepare a Quote-Ready Scope

A focused request should include the one-line diagram, equipment schedule, source data, known downstream device models, desired operating objectives, and required operating modes. State the proposed lineup's mains, feeders, ties, metering, and protective functions, while identifying unresolved items. Include project location, delivery constraints, and requested documentation so the manufacturer can assess fabrication scope and schedule feasibility.

For custom-fabricated new equipment, the manufacturer can review the defined configuration and coordinate questions about device selection, compartments, bus arrangement, and documentation. U.S. manufacturing with American components, short lead times, and nationwide shipping may support project planning, but timing and component availability depend on the confirmed design and supply conditions.

Close the Engineering Review Loop

Before settings are finalized, the study engineer should validate input data, calculate fault conditions, compare device characteristics, and document limitations or exceptions. Review proposed settings with the equipment supplier as needed to confirm that the specified devices and options are available in the intended configuration. Field commissioning and setting verification remain distinct from equipment manufacture.

The final design should be checked by the responsible engineer and, where applicable, the utility and AHJ. If source data, device models, or operating modes change, reassess the study rather than carrying forward unverified conclusions. Clear coordination objectives and complete inputs help align the new distribution equipment with the protection plan without implying universal selectivity or predetermined settings.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields