Solar Interconnection Switchgear

Specify new solar interconnection switchgear around the point of connection, project voltage, fault-duty conditions, and utility review requirements. We build custom distribution equipment in the U.S. and ship nationwide.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Switchgear cabinets with breakers on warehouse pallets
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Define the Interconnection Boundary

Solar interconnection switchgear links photovoltaic generation with a facility distribution system or utility point of connection. Begin by identifying which equipment lies on the customer side of the boundary, who owns and operates each section, and where metering, protection, and disconnecting functions must be located. These decisions shape the lineup.

A one-line diagram should show the PV inverters, transformers, existing service equipment, proposed switchgear, loads, and utility connection. Confirm whether the project is behind-the-meter, exporting power, or using a non-export control scheme. Utility rules and the approved interconnection design—not a generic product description—determine the final arrangement.

Choose Equipment for the System Voltage

Select equipment by the voltage and application at the actual connection point. UL 891 applies to low-voltage switchboards; it does not cover medium- or high-voltage equipment. Low-voltage switchgear built to UL 1558 is a distinct equipment category. Medium-voltage assemblies require their own applicable standards and project-specific review.

The voltage level, continuous current, available fault current, and system grounding influence construction and component selection. Confirm these values with the electrical engineer and utility, including changes expected from the PV source or a transformer. A manufacturer can use this information to develop a suitable new lineup rather than assume a standard configuration.

Coordinate the Utility Review

Utilities may specify interconnection drawings, protective functions, visible isolation, revenue metering, relay settings, or access requirements. The applicable list varies by utility, service voltage, project size, and interconnection agreement. Obtain the current utility requirements and review them with the responsible engineer before equipment details are released for fabrication.

Utility acceptance is separate from a manufacturer’s equipment design and does not follow automatically from a product description. Identify required submittals, review milestones, and any utility-furnished devices or compartments. Clarifying responsibility for relays, CTs, PTs, wiring, and settings early helps prevent scope gaps between the equipment package and the overall project.

Plan Protection and Switching Functions

Protection must address the interaction of utility supply, PV generation, and facility loads. The engineer should establish the required overcurrent and ground-fault protection, trip sources, isolation points, and any directional or voltage-based functions. Relay selection and settings depend on the approved study, utility criteria, equipment ratings, and system operating modes.

Confirm whether the lineup needs a main device, generator or feeder breakers, a tie, metering provisions, or provisions for future circuits. Decide how interlocks and control power will be arranged, and who supplies control logic. Anti-islanding functions are commonly associated with inverter systems, but their implementation and utility review must be verified for the project.

Check Fault Duty and Operating Modes

Available fault current at the connection point is a key equipment-selection input. Request the utility’s source data and coordinate it with transformer impedance, conductor details, and the engineer’s short-circuit study. PV inverters can contribute fault current differently from rotating machines, so their documented behavior should inform protection and coordination rather than unsupported assumptions.

Review normal, maintenance, and abnormal operating configurations, including whether a tie can be closed and whether the facility can island. Confirm equipment interrupting and withstand requirements for the applicable configuration, along with coordination and arc-flash study inputs. The responsible engineer should validate the design and have the utility and AHJ review it where required.

Resolve Physical and Environmental Constraints

Lineup dimensions and access depend on room layout, working clearances, cable entry, conduit routing, and the location of existing distribution equipment. Provide plan views, elevations, service access constraints, and field-verified connection details. For outdoor installations, identify exposure, enclosure needs, temperature range, and site conditions for project-specific evaluation.

Cable landing space, bus orientation, and termination arrangement should be coordinated with conductor sizes and installation methods. Confirm whether the utility requires a separate metering section or a particular access arrangement. These details can affect custom fabrication, so include them in the equipment scope before drawings are approved and construction begins.

Prepare a Complete Quote Package

For a useful quotation, provide the one-line diagram, project voltage, system grounding, source and load ratings, fault-current information, and the proposed point of connection. Include utility requirements, preferred equipment standard or category, indoor or outdoor location, and any known metering, relay, or disconnect requirements.

Also share available room drawings, cable entry direction, conductor and termination data, control schematics, and required submittal information. Identify what is furnished by others, the project schedule, and any future expansion needs. Missing inputs may require clarification before configuration, pricing, and lead-time expectations can be established responsibly.

Build Around the Approved Design

We manufacture new switchgear and power distribution equipment in the U.S., with American components, custom fabrication, short lead times, and nationwide shipping. Final construction details depend on the approved project documents and the selected equipment category; ratings, listings, and features must be confirmed for the specific build.

Before release, have the responsible engineer reconcile manufacturer drawings with the utility’s interconnection requirements, protection studies, and site conditions. The AHJ and utility should review the design where applicable. This coordinated review helps align the switchgear interface with installation and operating needs without assuming that one configuration fits every solar project.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields