Request a Quote

Power distribution equipment

Automatic Transfer Switches

Specify a new automatic transfer switch around the source arrangement, load, operating sequence, and control interface. We build custom equipment in the U.S. with American components and ship nationwide.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Installed switchboard lineup beneath overhead conduit
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Transfer between defined power sources

An automatic transfer switch (ATS) connects a load to one of two power sources, commonly utility service and an on-site generator. Its controller monitors configured source conditions and operates the switching mechanism according to an approved sequence. The application determines whether transfer is automatic, supervised, or subject to operator action.

The switch is not the generator, service entrance, or complete distribution system. It must be coordinated with upstream protection, downstream loads, grounding and bonding, and the available fault current. Identify the normal and alternate sources, their nominal voltage and phase, and the intended loads before selecting an arrangement.

Choose the switching arrangement

Specify the required poles and switching method with the system grounding design in view. Whether the neutral is switched can affect grounding and bonding, generator configuration, and protection; it is not a universal choice. The responsible engineer should confirm the arrangement against the electrical system and applicable requirements.

Open-transition operation disconnects one source before connecting the other, creating a brief interruption. Closed-transition operation momentarily parallels sources and requires careful source synchronization and utility coordination where applicable. Confirm whether interruption is acceptable, whether paralleling is permitted, and which transition sequence the project requires.

Match electrical ratings to the installation

Provide system voltage, frequency, continuous load current, number of phases, and expected load characteristics. Motor starting, transformer inrush, nonlinear loads, and future load growth can influence sizing and switching-device selection. Do not size from a single nameplate value without reviewing the actual load profile and applicable design criteria.

Confirm available fault current and the protective-device coordination approach. Withstand and closing capability, short-circuit ratings, and upstream overcurrent protection must suit the specific system and equipment configuration. Ratings and approvals are build-specific; the responsible engineer should verify them against the final design rather than assume a standard value.

Define the source-monitoring sequence

The controller’s decisions depend on which source conditions it monitors and the thresholds and delays selected. Discuss acceptable voltage and frequency windows, phase-loss or phase-rotation monitoring where needed, transfer delay, and retransfer behavior. Settings should reflect generator response, load sensitivity, and the utility’s expected operating conditions.

A typical sequence may start the generator after normal-source failure, transfer once the alternate source qualifies, then retransfer after normal power returns and stop the generator after a cooldown. Confirm each step, including test mode, inhibit conditions, and operator overrides. A sequence description prevents assumptions about how the switch responds during abnormal events.

Plan controls, signals, and interfaces

List the control connections required between the ATS, generator controls, building management system, fire alarm, and other project systems. Possible needs include engine start contacts, position indication, source-available status, common alarms, and remote test or inhibit inputs. Confirm contact form, voltage, isolation, wiring responsibility, and termination details for each interface.

Decide whether local indication, remote monitoring, communications, or a particular protocol is required. Interface capabilities vary by controller and selected build, so identify the receiving system and its requirements rather than assume compatibility. Provide point lists, sequence narratives, and preferred communication details for review before drawings are finalized.

Coordinate enclosure and distribution integration

The installation may call for a standalone transfer switch or an arrangement integrated with distribution equipment. Establish whether the ATS is service-entrance equipment, its upstream and downstream devices, and the intended connection method. Confirm enclosure type, environmental conditions, available space, access clearances, cable entry, and indoor or outdoor placement.

For a coordinated lineup, provide one-line diagrams, equipment layout constraints, conductor information, and any required metering or protective functions. Integration affects access, wiring routes, and coordination with adjacent equipment. These details are project-specific and should be reviewed by the electrical designer, installer, utility, and authority having jurisdiction as appropriate.

Assemble useful information for a quote

A complete quote request includes the one-line diagram, load and source data, required ratings, switching method, pole configuration, enclosure and environmental needs, and control sequence. Add drawings or specifications for the generator, upstream protection, downstream distribution, and control interfaces. Identify the project location and requested submittal requirements.

Flag special operating conditions, maintenance access needs, testing expectations, and any utility or owner standards. If a requirement is undecided, label it for engineering review rather than treating it as settled. Clear inputs help define a buildable scope, expose coordination questions early, and support an accurate equipment proposal.

Custom-built equipment and project review

We manufacture new transfer and power distribution equipment in the United States using American components, with custom fabrication for project-specific configurations and nationwide shipping. Lead times depend on the defined scope, component availability, review, and production requirements; confirm current expectations when requesting a proposal.

Before release, have the responsible engineer review ratings, source coordination, grounding, protective devices, control sequence, and interfaces. The utility and AHJ should be consulted where their requirements apply. Final drawings and submittals should resolve open decisions for the specific build; no configuration should be presumed suitable without that project review.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields