Plan a new metering switchboard around the building’s tenant count, service arrangement, feeder routes, and serving-utility requirements. We build custom equipment in the U.S. with American components for Parma projects and ship nationwide.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Electrical distribution lineups in a spacious equipment facility
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Start with the Building’s Service Plan

A multifamily metering switchboard brings service distribution and individual tenant metering into a coordinated assembly. Begin with the electrical one-line diagram, utility service information, and a unit schedule. Confirm how many apartments, house loads, retail spaces, and future spaces require separate metering; these determine the meter positions and downstream distribution needs.

Parma projects may differ in service voltage, service entrance location, and utility-approved metering arrangement. Obtain current requirements from the serving utility rather than relying on a previous building’s installation. The responsible engineer should reconcile those requirements with the project’s service calculation, applicable codes, and plans before equipment configuration is finalized.

Determine Grouped Meter Provisions

Grouped meters can simplify a common service installation, but the layout must suit the unit count and available wall or electrical-room space. Identify meter positions by apartment or tenant designation, and account for house meters where required. Confirm whether spare positions or provisions for planned expansion are needed; do not assume unused meter spaces will be accepted by the utility.

Provide the manufacturer with the proposed meter arrangement, utility metering specifications, and any required meter socket or compartment details. The utility determines acceptable metering practices, while the engineer coordinates equipment ratings and code requirements. Confirm meter access, working clearances, and the route for utility conductors against the actual room plan.

Coordinate Tenant Feeder Requirements

Each tenant feeder must correspond clearly to its meter position and served space. Share the feeder schedule, conductor information, load assumptions, and destination locations so the assembly can be arranged to support the intended distribution. If apartment panels are remote from the service room, review feeder routing, voltage drop, conductor space, and termination access during design.

Clarify whether tenant feeders leave the switchboard directly or connect through separate distribution equipment. Feeder overcurrent protection, ampacity, and equipment interrupting requirements depend on the engineered system and available fault current; they are not interchangeable assumptions. The responsible engineer should verify coordination, conductor sizing, and applicable code provisions for the specific installation.

Review House Loads and Shared Areas

Common-area loads need deliberate treatment alongside apartment meters. Elevators, corridor lighting, fire pumps, mechanical equipment, garages, and other shared services may require separate distribution or metering arrangements. Provide load schedules and identify which loads belong to the owner, tenants, or utility-defined categories so the metering scheme reflects the intended billing and operational boundaries.

House service sizing should account for the actual equipment and applicable demand calculations, not simply a percentage added to tenant loads. Confirm whether the project has commercial tenants, electric vehicle charging, central heating or cooling, or other significant loads. These can affect feeder organization, service capacity, and the available space needed for distribution sections.

Confirm Utility and Site Interfaces

Utility coordination should establish service characteristics, meter acceptance criteria, access expectations, and the division of responsibility for service conductors and metering components. Ask the serving utility to review the proposed arrangement early enough to resolve changes before fabrication. Requirements can vary by service type and project conditions, so a generic meter layout should not be treated as approval.

The site plan and electrical room drawings should show the service entrance, working space, equipment access, conductor entry, and adjacent obstructions. Confirm whether the utility needs exterior access or a particular meter-reading arrangement. The electrical contractor should verify installation and utility interface details with the engineer and serving utility before ordering equipment.

Select the Appropriate Equipment Type

A low-voltage metering switchboard is commonly specified under UL 891 where the project design and equipment configuration call for a switchboard. UL 891 applies to switchboards, not medium-voltage equipment. If the service voltage or system arrangement points to a different equipment class, the engineer must select the applicable design and standards rather than extending a switchboard specification.

Distinguish a UL 891 switchboard from UL 1558 low-voltage switchgear: they are separate equipment categories with different construction and application considerations. Medium-voltage distribution also requires equipment suited to that voltage class. Confirm the specified equipment type, voltage, fault-duty basis, and required approvals for the actual project; listing or ratings must not be presumed for a custom build.

Prepare Complete Quote Information

For a useful quote, provide the one-line diagram, service voltage and phase, calculated loads, available fault-current information, meter count and layout, feeder schedule, and utility requirements. Include the project’s electrical-room dimensions, cable entry preferences, and any constraints on shipping or installation. Identify the required equipment type and requested ratings as engineer-specified project inputs.

Also share the anticipated schedule, drawing review milestones, and scope boundaries for equipment and field work. Note any required accessories, metering compartments, spare provisions, or special labeling for tenant identification. We can evaluate custom fabrication for the stated requirements and provide newly manufactured equipment; final configuration depends on complete project documents and utility coordination.

Coordinate Fabrication Through Installation

We manufacture new switchgear and power distribution equipment in the U.S. using American components, with custom fabrication, short lead times, and nationwide shipping. For a Parma project, confirm the requested delivery sequence and site receiving conditions early, particularly where equipment-room access or construction phasing may constrain the shipment and installation plan.

Before release, have the responsible engineer review drawings for meter grouping, tenant feeder destinations, service interfaces, and code-related design details. The contractor should confirm field dimensions and installation conditions, while the serving utility and authority having jurisdiction review matters within their scope. This coordination helps align the equipment with the approved project design without assuming universal requirements.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields