Specify a laboratory switchboard by mapping research spaces to feeders, defining normal and alternate sources, and reserving practical capacity for future work. Our U.S.-built, custom-fabricated equipment is supplied to projects in Bowling Green and nationwide.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Installed switchboard lineup beneath overhead conduit
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Start with the laboratory load map

A useful switchboard design begins with a room-by-room load schedule, not a single campus demand estimate. Identify laboratories, shared instruments, environmental systems, exhaust equipment, support rooms, and research equipment with distinct operating schedules. Note which loads are continuous, intermittent, sensitive to interruption, or expected to operate together during peak research activity.

For each load, provide voltage, phase, estimated demand, connection method, and available nameplate information where known. Separate firm loads from preliminary planning allowances. The responsible electrical engineer can use this information to establish demand assumptions and feeder quantities; incomplete schedules should be identified explicitly rather than converted into unsupported equipment ratings.

Allocate feeders for research use

Feeder allocation affects both present operation and future changes to laboratory layouts. Group loads only where operating purpose, protection, and shutdown procedures make that arrangement appropriate. Dedicated feeders may be needed for particular instruments, process equipment, or systems whose maintenance or interruption should not affect unrelated research spaces.

Confirm the number and type of outgoing circuits, conductor terminations, routing constraints, and expected spare positions. Physical space for future breakers is not the same as spare electrical capacity: both must be considered, along with bus loading, available fault current, and coordination. The engineer should document which allowances are included in the design basis.

Define normal and alternate sources

Clarify how the switchboard connects to the campus distribution system. Provide the normal source characteristics, service arrangement, grounding method, and utility or campus ownership boundary. If a generator, second utility source, or other alternate supply is planned, describe its interface and the loads intended to transfer or remain energized.

Source transfer is a system-design decision, not simply a switchboard accessory selection. Confirm whether transfer equipment is upstream, integrated into a defined lineup, or supplied separately, and identify sequencing, interlocking, and control responsibilities. Review source capacity, fault contribution, and operating modes with the campus electrical engineer and utility where applicable.

Choose equipment by system voltage and application

For low-voltage distribution, distinguish a UL 891 switchboard from UL 1558 low-voltage switchgear when establishing the specification. These are different equipment categories, and the choice depends on project requirements such as construction, device arrangement, service conditions, and the engineer’s design. UL 891 does not apply to medium- or high-voltage equipment.

If the laboratory project includes a medium-voltage source or distribution interface, treat that equipment as a separate application with its own voltage class, protection, and coordination requirements. Confirm the actual scope boundary between medium-voltage gear, transformers, and low-voltage switchboard. Equipment configuration and applicable standards must be established for the specific project, not assumed from a building label.

Plan future research allowances deliberately

Research programs change, but an undefined future-load percentage can obscure the real design need. Identify anticipated expansions such as additional instrument bays, larger process equipment, or conversion of support space. For each, provide an estimated load range, likely voltage, expected timing if known, and whether the future load needs a dedicated feeder or source.

Translate those allowances into reviewable decisions: reserved breaker spaces, bus capacity, enclosure dimensions, and provisions for routing future conductors may each matter. Confirm whether the source and upstream distribution can support projected demand. Avoid treating empty spaces as a promise of available capacity; final additions require engineering review of loading, protection, and fault-duty conditions.

Coordinate protection, fault duty, and operations

Provide available fault-current data at the proposed switchboard location, upstream protective-device information, and any existing coordination or arc-flash study criteria. The responsible engineer should verify interrupting and withstand requirements, protective-device selection, and coordination across normal and alternate operating conditions. Changed sources or tie arrangements can alter fault contribution and protection behavior.

Discuss access and operating practices with facilities staff and contractors. Identify maintenance clearances, cable entry direction, room limitations, labeling conventions, and any restrictions on shutdown windows. Confirm which devices require selective operation or local control, and how the board will be isolated for work. These project details influence arrangement and documentation, but do not replace site-specific safety procedures.

Prepare a quote-ready project package

A focused request for quotation should include one-line diagrams, panel or feeder schedules, load data, source and grounding details, fault-current information, and applicable specifications. Add available room plans, access dimensions, cable routing assumptions, and the anticipated delivery sequence. Mark unresolved items and identify who will provide final engineering decisions or utility data.

State requested equipment category, nominal system characteristics, incoming and outgoing device requirements, metering or control needs, and any specified standards. Include the desired scope boundary for switchboard, transfer equipment, and related accessories. A manufacturer can review the package for fabrication scope and identify information needed to develop a project-specific proposal without presuming unconfirmed features.

Build and supply for Bowling Green projects

We manufacture new switchboards and power distribution equipment in the United States using American components, with custom fabrication for project-specific layouts and feeder requirements. For university laboratory work in Bowling Green, early coordination of drawings, source interfaces, and future-load assumptions helps clarify the equipment scope before fabrication planning begins.

We supply new equipment to customers in Ohio and nationwide, with short lead times and nationwide shipping. Actual schedule depends on the approved design, component availability, and project requirements. Have the engineer confirm the final design, and coordinate utility interfaces and applicable approvals with the utility and authority having jurisdiction before release.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields