Request a Quote

Manufacturing capabilities

Current and Voltage Transformer Wiring

Specify instrument-transformer ratios, secondary wiring, protective shorting provisions, and meter interfaces early. Our U.S.-built equipment can be custom fabricated for project requirements and shipped nationwide.

01 / BUILT WITH PURPOSE SWITCHGEAR BUILDERS OHIO

Installed switchboard lineup beneath overhead conduit
REPRESENTATIVE
EQUIPMENT
01
Made in USAAmerican manufacturing
02
UL 891 assembliesFor applicable low-voltage switchboards
03
Short lead timesTiming quoted per project

Start with the Measurement and Protection Purpose

Current transformers (CTs) and voltage transformers (VTs), also called potential transformers, adapt primary-system quantities for metering, monitoring, or protective relays. Before selecting ratios or terminal arrangements, establish which devices each transformer will serve and whether the circuit is for indication, billing, protection, or more than one function.

Those uses can impose different accuracy and burden requirements. A metering circuit may prioritize performance near normal operating current, while a protective application must be coordinated with the relay and fault-current conditions. Identify the applicable utility or owner standards, relay and meter models, and required measurement functions for the design review.

Select Ratios from the Actual System

Choose a CT ratio by relating the primary current to expected load, system capacity, and the connected instrument’s input range. A ratio selected only from nominal load can leave inadequate range for future operation or produce poor resolution at typical current. Confirm primary ratings, expected operating range, fault duty, and connected burden.

VT ratio selection follows system voltage and the secondary voltage required by meters or relays. Confirm phase-to-phase or phase-to-neutral measurement, system grounding, and whether the application requires a grounded or ungrounded secondary arrangement. Provide nominal and maximum system voltage, frequency, and the instrument input specifications so the responsible engineer can verify suitability.

Coordinate CT Secondary Wiring and Polarity

CT secondary circuits require deliberate polarity and terminal identification. Incorrect polarity or phase association can produce misleading power, energy, and directional protection measurements, even when the equipment is energized and readings appear plausible. Coordinate CT markings, phase labels, terminal blocks, conductor routing, and the wiring diagrams with the metering and relay schematics.

A CT secondary must not be left open while primary current flows, because an open circuit can create a hazardous secondary voltage and damage insulation. Define a continuous connection path through terminals and instruments, and specify approved shorting provisions for maintenance. Confirm conductor size and route against circuit burden, terminal capacity, and project wiring practices.

Plan VT Fusing, Grounding, and Isolation

VT secondary circuits generally need coordinated overcurrent protection and a defined grounding arrangement. The location and configuration of fuses or other protective devices depend on the circuit design, connected loads, applicable standards, and equipment layout. Confirm which circuits require individual protection and how isolation will be accomplished for testing or maintenance.

Specify the secondary grounding point and show it consistently on the elementary and wiring diagrams. Multiple unintended ground connections can create circulating current or interfere with measurement, while a missing intended ground can compromise the scheme. Review phase connections, neutral treatment, fuse ratings, and isolation needs with the responsible engineer and, where applicable, the utility.

Make Shorting and Test Access Explicit

For CT circuits, a shorting terminal block or test switch can provide a controlled way to maintain a closed secondary circuit while isolating an instrument. The required arrangement depends on the number of CT circuits, meter and relay connections, and maintenance procedure. Identify whether shorting, isolation, test plugs, or dedicated test points are needed.

VT test arrangements differ: the design may require disconnecting or isolating voltage inputs rather than shorting them. Define which circuits must be accessible, how test equipment will connect, and what switching sequence the maintenance documentation will require. Clear terminal labeling and a coordinated schematic help prevent confusion between CT shorting functions and VT isolation.

Match Transformer Circuits to Metering Interfaces

Provide the make and model, input type, and connection diagram for each meter, relay, transducer, or monitoring device. Confirm whether inputs are intended for conventional CT and VT secondaries, the required phase arrangement, and any separate circuits for revenue metering or protection. These details affect terminal count, wiring segregation, and transformer selection.

Where a utility specifies revenue metering, its approved ratios, accuracy requirements, test switches, sealing provisions, and wiring rules may govern the design. Do not assume an existing meter interface can be reused unchanged for a new lineup. Obtain utility requirements early and coordinate them with equipment drawings, instrument locations, and the metering contractor’s scope.

Integrate Wiring with the Equipment Layout

Instrument-transformer placement and secondary routing must work with the switchboard or switchgear configuration, barriers, cable entry, and service access. Describe the lineup arrangement, incoming and outgoing sections, metering compartments, and preferred instrument locations. The manufacturer can review these project-specific details for a custom-fabricated new equipment configuration.

Separate control and instrument circuits from power conductors as required by the design and applicable standards. Account for terminal accessibility, wiring space, bend radius, shielding or grounding practices specified for sensitive signals, and clear identification at both ends. Final routing and separation should be checked against the equipment drawings and project installation requirements.

Prepare a Complete Quotation Package

For a useful quotation, submit system voltage, frequency, grounding method, available fault information, CT and VT ratios, accuracy or burden requirements, and the intended metering and protection functions. Include one-line diagrams, elementary schematics, meter and relay data, utility standards, terminal preferences, test-access needs, and any required documentation or drawing review milestones.

Also identify the equipment type and applicable construction standard; UL 891 switchboards, UL 1558 low-voltage switchgear, and medium-voltage equipment are distinct categories. Our U.S.-built new equipment uses American components, supports custom fabrication, and ships nationwide. Have the responsible engineer verify the design and confirm utility and AHJ requirements before release.

PROJECT PARAMETERS

Details make
the difference.

Every project is different. Use these points as a starting place for a conversation about your requirements.

Discuss your specifications
SPECIFICATION OVERVIEW01 — 06
Project specification overview
Equipment & scopeDefined by project requirements
Voltage classConfirm for the application
Current ratingConfirm for the application
Applicable standardsUL 891 for applicable low-voltage switchboards; other standards per specification
ManufacturingMade in USA with American components
Lead timeQuoted per project

Final configuration, ratings, standards, and timing are confirmed with your quote.

LET'S GET TO WORK

Tell us what
you’re building.

Share the essentials and start a conversation about equipment for your project.

Prefer to talk?(951) 403-5738

Email our team at saleselectricalbuyers@gmail.com.

SWITCHGEAR BUILDERS OHIO
BUILT FOR THE WORK AHEAD

PROJECT INQUIRY

Request a quote

This form opens your email application where supported. Review and send your request to saleselectricalbuyers@gmail.com from your email app; nothing is submitted directly through this website.

* Required fields