The connection between bus sections
A bus tie is a switching device or assembly that connects two sections of a distribution bus. In a low-voltage switchboard or switchgear lineup, it is commonly installed between bus sections so operators can connect or separate them under defined system conditions.
The tie does not create power or independently determine where power flows. Its effect depends on the connected sources, loads, conductor paths, and the device’s open or closed state. A one-line diagram should show the tie and its relationship to incoming breakers, feeders, transformers, and other sources.
Why a system may include a tie
A tie can provide an alternate way to supply one bus section when its normal source is unavailable or isolated for planned work. It may also allow operators to divide loads between sections during normal service. Whether either arrangement is permitted depends on the facility’s operating procedures and electrical design.
Connecting sections can also change fault current, loading, and protection coordination. A tie is not automatically a redundancy feature: the alternate source must have adequate capacity, and the transfer method must suit the loads. Confirm which operating conditions the design is intended to support before specifying equipment.
Common lineup arrangements
A typical arrangement has two bus sections, each supplied by its own main device, with a tie device between them. Some systems use a main-tie-main arrangement, while others connect multiple sections or use a tie in a different bus configuration. These labels describe arrangements, not a single universal control scheme.
The device may be a circuit breaker or another switching device selected for the application. Physical construction can include a dedicated tie section within a lineup, with bus connections and barriers arranged to match the approved design. Confirm the intended device type, compartment layout, and connection points on project drawings.
Open-transition and closed-transition operation
In open-transition operation, one source is disconnected before the tie connects the affected bus to another source. This avoids intentionally paralleling the sources, but can produce a brief interruption. Loads that cannot tolerate that interruption may require a different transfer strategy or separate ride-through provisions.
Closed-transition operation connects sources briefly in parallel during transfer. This requires sources and controls suitable for paralleling, with utility approval and protective measures where applicable. Do not assume a tie supports either method from its name alone; confirm permitted sequence, interlocks, synchronization needs, and operating limits with the responsible engineer.
Ratings and fault-duty checks
The tie device and its bus connections must be selected for the system’s voltage, continuous current, and applicable short-circuit duty. When a normally open tie closes, available fault current can differ from the value calculated with the sections isolated. The engineer should evaluate relevant source combinations and operating cases.
For low-voltage equipment, identify the applicable construction standard and required ratings for the complete assembly and switching device. UL 891 applies to switchboards; UL 1558 applies to low-voltage switchgear. Neither standard covers medium-voltage equipment. Medium-voltage applications require equipment and standards appropriate to their voltage class.
Protection, controls, and interlocks
Protection must account for current flowing through the tie in each allowed configuration. Breaker trip settings, relaying, metering, and selective coordination may need review when a bus changes from one source to another. The required protective functions depend on the fault study and the utility and facility protection schemes.
Controls can be manual, electrically operated, or part of an automatic transfer sequence, depending on project requirements. Mechanical or electrical interlocks may prevent unsafe or unauthorized combinations, such as closing the tie while both mains remain connected. Specify desired permissives, alarms, control power, remote signals, and operator actions rather than assuming standard logic.
Operating plan and installation details
Document which device is normally open, who may operate it, and what checks are required before changing states. Procedures should address source availability, load capacity, switching sequence, and restoration to normal configuration. The responsible engineer and facility team should verify that the proposed sequence matches the actual operating environment.
Physical requirements also affect the design: lineup location, incoming and outgoing cable or bus connections, access clearances, ventilation, and room conditions should be confirmed. Identify seismic, environmental, maintenance, and arc-flash considerations where applicable. Final drawings and installation details should be reviewed against project requirements and applicable codes by responsible parties.
Information to provide for a new-build quote
For a useful quote, provide the one-line diagram, system voltage and frequency, source and transformer data, bus-section loads, and available fault-current information. Include required continuous and short-circuit ratings, device preferences, enclosure and access needs, and the applicable switchboard or switchgear standard. Flag any medium-voltage equipment separately.
Also describe the normal tie state, transfer method, interlocking and control expectations, metering, communications, and utility constraints. Identify the project location, schedule needs, shipping destination, and relevant specifications or drawing formats. The manufacturer builds new equipment in the U.S. with American components, offers custom fabrication, short lead times, and nationwide shipping; final scope remains subject to design review.